In the current construction industry, planning and scheduling software are used as billing tools.
Answer the following statement true (T) or false (F)
True
You might also like to view...
Three components are randomly sampled, one at a time, from a large lot. As each component is selected, it is tested. If it passes the test, a success (S) occurs; if it fails the test, a failure (F) occurs. Assume that 80% of the components in the lot will succeed in passing the test. Let X represent the number of successes among the three sampled components.
a. What are the possible values for X?
b. Find P(X=3).
c. The event that the first component fails and the next two succeed is denoted by FSS. Find P(FSS).
d. Find P(SFS) and P(SSF).
e. Use the results of parts (c) and (d) to find P(X=2).
f. Find P(X=1).
g. Find P(X=0).
h. Find .
i. Find .
j. Let Y represent the number of successes if four components are sampled. Find P(Y=3).
In general, high relative humidity is beneficial to indoor plants, but what are some of the possible problems that it might cause?
What will be an ideal response?
Open loop systems do not have feedback but are self regulating
Indicate whether the statement is true or false
If the diameter of a piston is 178 millimeters (mm), find the area of the top of the piston to the nearest tenth square millimeter.
A. 24,750.3 B. 24,884.6 C. 24,966.9 D. 24,973.0