A bearing on a large machine is tested over a period of 8 hours at a speed of 40,500 revolutions per hour. How many revolutions does the shaft turn in the bearing during the test period?
Fill in the blank(s) with the appropriate word(s).
324,000
You might also like to view...
A textured architectural-concrete surface is achieved by _____.
a. painting it b. covering it with veneer c. liners attached to forms d. adding an air-entraining admixture
A ____ gear moves freely on its shaft.
A. fixed B. sliding C. sprag D. scissors
A total of 100 maintenance costs, C, for ground-mounted transformers in high-density housing areas were collected by the City Electricity Authority. The costs are clustered into $200 cells with midpoints ranging from $600 to $2000. The number of times (frequency) each cell value was observed and its probability are shown. Find the expected value of the costs, E(C), for use in a PW analysis.
If a ring gear has 36 teeth and the pinion gear has 12 teeth, what is the gear ratio?
A) 18:1 B) 3.26:1 C) 3.00:1 D) 24:1