If a project in Project 2013 is set to Auto Scheduled, Project uses the ________ to determine the task Start or Finish date

A) duration B) task relationships C) resources D) constraints


D

Computer Science & Information Technology

You might also like to view...

What is the value of x after the following code segment executes, if y is 20 and z is 2?

switch (y – z) { case 20: x = y + z; break; case 21: x = y; break; case 22: x = z; break; default: x = y * 2; }

Computer Science & Information Technology

You can change the size of a picture in Expression Web by dragging ____ .

A. the sides of the image B. a corner of the image C. the picture D. both a and b

Computer Science & Information Technology

Which of the following is a characteristic of wet pipe fire suppressions systems?

a. Water held back by a clapper b. Always contains water c. Air blows out of a pipe; the water flows d. Preferred for computer installations

Computer Science & Information Technology

The X.500 standard defines a protocol for a client application to access an X.500 directory known as which of the following options?

A. DIB B. DAP C. DIT D. LDAP

Computer Science & Information Technology