Which of the following sequence instructions would be used for a machine control problems where multiple machine actuators must be controlled for 15 machine states with each start on for a different length of time?
A) Event controlled SQL sequencer. B) Timer controlled SQL sequencer.
C) Timer controlled SQO sequencer. D) Event controlled SQO sequencer.
C
You might also like to view...
The germ spot of a fertilized or non-fertilized egg is called the blastoderm
Indicate whether this statement is true or false.
The United States has the largest-known coal reserves in the world
Indicate whether the statement is true or false
When the fuel oil tank is located below the burner, a __________-pipe system is necessary.
A. 1 B. 2 C. 3 D. 4
When driving out rusted bolts, technician A places the round end of a ball peen hammer over the bowl and then hits the fly end of the ball peen hammer with a sledgehammer. Technician B uses of Phillips tip screwdriver and a ball peen hammer to drive out small rusted bullets. Who is correct?
What will be an ideal response?