If a contractor has a time extension that is justified, how is the amount of time determined?
What will be an ideal response?
The contractor’s project schedule, coupled with an analysis of any float, may
be used to determine entitlement and the duration of any time extension.
You might also like to view...
Rowlocks should not be used as a bonding arrangement for semicircular brick arches.
Answer the following statement true (T) or false (F)
Which of the following is not a typical cause of unsuccessful events?
a. spending money on marketing and publicity b. poor timing c. not enough money to put on the event d. lack of creativity and innovation
Holes bored in joists for piping or wiring should not be larger than one-____ of the joist depth.
a.sixteenth b.eighth c.quarter d.third
Water vapor in the air condenses on the evaporator coil:
A) All the time, even when the system is not operating. B) Whenever the evaporator is below the dew point of the air. C) Whenever there is moisture in the refrigerant. D) Whenever the system is operating.