Batter boards and string lines are erected at the building corners and selected locations on the perimeter to

establish a _____.

a. grid layout
b. coordinate layout
c. sector layout
d. squared layout


a

Trades & Technology

You might also like to view...

While having a discussion, Technician A says that a rear main bearing seal leak is indicated when there is oil on the transmission side of the torque converter. Technician B says that a rear main bearing seal leak is indicated when there is oil on the engine side of the flywheel or torque converter. Who is correct?

A. A only B. B only C. Both A and B D. Neither A nor B

Trades & Technology

The spacing between bolts, or pitch, in standard bolted connections is usually _______________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

The result of a casting print is the fabrication of a part.

Answer the following statement true (T) or false (F)

Trades & Technology

When constructing walls from brick or concrete block, it is not necessary and usually a waste of time to estimate the number of bricks or blocks and the amount of masonry cement and sand needed prior to beginning construction.

Answer the following statement true (T) or false (F)

Trades & Technology