Before a completed building can be used, permanent utilities must be installed and _____.

a. the owner must provide approval
b. approved by the architect
c. a certificate of occupancy issued
d. final payment made to the contractor


Answer: C

Trades & Technology

You might also like to view...

Through ____________________ cutting, it is possible to make very close parallel cuts without damaging the strip that is cut out.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Poultry embryos develop outside the mother's body

Indicate whether the statement is true or false

Trades & Technology

To obtain veneer, a bolt is placed in a ________________________, where it is turned rapidly while sharp knives cut the wood into a long, thin continuous sheet

Fill in the blank(s) with correct word

Trades & Technology

Each action (non-Boolean and Boolean) uses a(n) ____________________ to determine when it starts and stops.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology