What may occur as the result of a code revision?
What will be an ideal response?
Changes can occur as a result of outside agencies, such as the local building code authority, reviewing the project after the construction contract has been awarded. If the contract has been signed before the final plan check by the inspection agencies, change orders must be written to modify the change of scope caused by the review. The construction documents are often reviewed prior to pricing the project by contractors, but occasionally some reviews are made subsequent to issuance of the construction contract.
You might also like to view...
Each of the following incompressible substances are heated by increasing its internal energy by 1500 kJ, with the purpose of increasing the temperature from 300 K to 500 K. Determine the mass of each substance which will result in this temperature increase:
(a) aluminum (c = 0.90 kJ/kg-K) (b) gold (c = 0.13 kJ/kg-K) (c) zinc (c = 0.39kJ/kg-K) (d) gasoline (c = 2.08 kJ/kg-K). Given: ?U = 1500 kJ; T1 = 300 K; T2 = 500 K What will be an ideal response?
Fill in the missing values (A through D) for a loan of $10,000 if the interest rate is compounded at 10% per year.
The ________________________________________ is the primary scientific research agency of the USDA
Fill in the blank(s) with correct word
Wall cabinets are a standard front-to-back depth (usually ____), but the width and height vary.
A. 10" B. 12" C. 14" D. 15"