Explain the owner's responsibilities in the traditional project delivery system.
What will be an ideal response?
The owner is responsible for paying for the work contracted to the architect and to the contractor. He is responsible to the contractor for providing coordination of the project, whether through an architect, an in-house representative, a project manager, or a "clerk of the works." The owner also provides the site for the project, provides the architect with whatever one needs, and may determine the scope of the project. Additionally, the owner provides the contractor with documents that adequately describe what the project will entail.
You might also like to view...
Which of the following statements about supercapacitors is LEAST-Likely to be true?
A. supercapacitors can discharge and store electricity as the output of the battery pack changes. B. supercapacitors cannot be overcharged; they just get full. C. supercapacitors contain toxic materials that require special environmental consideration during disposal. D. a supercapacitor can recharge very quickly and can also discharge very quickly.
An instrument used to measure values of resistance is called a(n) __________.
a. ammeter b. ohmmeter c. voltmeter d. wattmeter
Discuss what a designer must consider as a part is planned.
What will be an ideal response?
Which of the following silicate clays would be least apt to be formed from the mere alteration of primary minerals?
A) vermiculite B) chlorite C) iron or aluminum oxides D) smectite E) fine-grained micas