In areas with little seismic activity it is not customary t for construction drawings to specify nailing schedules, but in high seismic areas nailing is typically specified by the ___________engineer.

A. Soil engineer
B. architect
C. structural engineer
D. seismic expert


Answer: C

Trades & Technology

You might also like to view...

Describe the differences between primary and secondary standards as established by the EPA.

What will be an ideal response?

Trades & Technology

The NECĀ® allows the load calculation for the grounded neutral conductor supplying electric ranges and dryers to have a demand factor of _____.

a. 50% b. 70% c. 85% d. 100%

Trades & Technology

All of the following precautions are suggestions for drivers when they come to a highway-rail intersection EXCEPT:

A. If there is a line of traffic at a traffic light and you may have to stop on a railroad track, a good rule of thumb is to never stop on a railroad track, even if you do not see a train coming. B. To better hear the train, roll down the window and turn off the stereo, CB, and fans. C. If a train is stopped nearby, do not cross the tracks for any reason. D. Stop no closer than 50 feet (15.2 m) from the nearest rail.

Trades & Technology

Which of the following is not necessary to have on hand when sketching?

A. paper B. pencil C. eraser D. none of the above

Trades & Technology