In areas with little seismic activity it is not customary t for construction drawings to specify nailing schedules, but in high seismic areas nailing is typically specified by the ___________engineer.
A. Soil engineer
B. architect
C. structural engineer
D. seismic expert
Answer: C
You might also like to view...
Describe the differences between primary and secondary standards as established by the EPA.
What will be an ideal response?
The NECĀ® allows the load calculation for the grounded neutral conductor supplying electric ranges and dryers to have a demand factor of _____.
a. 50% b. 70% c. 85% d. 100%
All of the following precautions are suggestions for drivers when they come to a highway-rail intersection EXCEPT:
A. If there is a line of traffic at a traffic light and you may have to stop on a railroad track, a good rule of thumb is to never stop on a railroad track, even if you do not see a train coming. B. To better hear the train, roll down the window and turn off the stereo, CB, and fans. C. If a train is stopped nearby, do not cross the tracks for any reason. D. Stop no closer than 50 feet (15.2 m) from the nearest rail.
Which of the following is not necessary to have on hand when sketching?
A. paper B. pencil C. eraser D. none of the above