Plan the testing required for the system. You should consider unit, integration, and system testing in your test plan and determine who should participate in the testing.
What will be an ideal response?
A test plan must address unit, integration, and system testing. The first step is unit testing, which involves a test of each data entry program or function using both valid and invalid data, as well as a test of each report generated by the system.
The next step is integration testing. Programs or functions that create or modify files used by other programs must be link tested with those other programs. In a database environment, this would involve testing all relationships and multi-table queries. Finally, all programs must be tested together in a system test, along with all system utility functions, including backup and recovery procedures.
Personal trainer should include employees at its test site who will use the equipment. Personnel should test software and devices that pertain to their functional use of the equipment in their daily job duties.
You might also like to view...
Having a this reference allows:
a. a method to refer explicitly to the instance variables and other methods of the object on which the method was called. b. a method to refer implicitly to the instance variables and other methods of the object on which the method was called. c. an object to reference itself. d. All of the above.
Explain how to finalize your video for DVDs.
What will be an ideal response?
In companies, Access is usually used to access tables contained in central systems, called ________
Fill in the blank(s) with correct word
Briefly define the following TCP flag settings: URG (Urgent), ACK (Acknowledgment), and PSH(Push).
What will be an ideal response?