Explain why product data submittals, samples, and shop drawings may be required for a project.

What will be an ideal response?


Product data submittals, samples, and shop drawings are required primarily for the architect and engineer to verify that the correct products will be installed on the project. This process also gives the architect and sub-consultants the opportunity to select colors, patterns, and types of material that were not chosen prior to completion of the construction drawings. This is an occasion for the architect not to select different materials than specified but rather to clarify the selection within the quality level indicated in the specification. For materials requiring fabrication, such as reinforcing and structural steel, the architect and engineer need to verify details furnished by the fabricator. The contractor also uses this information in installation, using dimensions and installation data from the submittal.

Trades & Technology

You might also like to view...

Solvents are used to make liquids into solid waste for disposal.

Answer the following statement true (T) or false (F)

Trades & Technology

Why should the storage space for tool boxes be in close proximity to the repair stall?

What will be an ideal response?

Trades & Technology

The types of injury electricity can inflict on a person include:

A) Electrical shock and burns. B) Electricity cannot inflict injury. C) Electrical shock. D) Electrical burns.

Trades & Technology

If three-phase transformation is needed and a three-phase transformer of the proper size and turns ratio is not available, three single-phase transformers can be connected to form a _____.

A. three-phase bank B. wye-delta bank C. wye bank D. delta bank