Solve the problem.A ceramics workshop makes wreaths, trees, and sleighs for sale at Christmas. A wreath takes 3 hours to prepare, 2 hours to paint, and 10 hours to fire. A tree takes 16 hours to prepare, 3 hours to paint, and 4 hours to fire. A sleigh takes 4 hours to prepare, 13 hours to paint, and 7 hours to fire. If the workshop has 114 hours for prep time, 79 hours for painting, and 108 hours for firing, How many of each can be made?
A. 4 wreaths, 6 trees, 5 sleighs
B. 7 wreaths, 6 trees, 5 sleighs
C. 5 wreaths, 4 trees, 6 sleighs
D. 6 wreaths, 5 trees, 4 sleighs
Answer: D
You might also like to view...
Provide an appropriate response.
Find the area of the triangle as shown. Round answer to four significant digits.
A. 12.58 in2 B. 9.826 in2 C. 6.288 in2 D. 4.913 in2
Use the bar graph to solve the problem.The bar graph below shows the numbers of various colors of cars owned by the employees of a certain business. Which two pairs of cars are in the ratio ?
A. Tan to Green and White to Red B. Yellow to Green and Tan to White C. Tan to Black and Black to Red D. Tan to Green and Black to White
Subtract.(-3x2 + 5x4 + 9 + 8x3) - (-8 + 6x3 + 8x4 + 5x2)
A. 13x4 + 14x3 + 2x2 + 17 B. 13x4 + 14x3 + 2x2 + 1 C. -3x4 + 14x3 + 2x2 + 1 D. -3x4 + 2x3 - 8x2 + 17
Find an equation of an ellipse satisfying the given conditions.Foci at (-4, 0), (4, 0); vertices at (-7, 0), (7, 0)
A. +
= 1
B. +
= 1
C. +
= 1
D. +
= 1