Technician productivity is calculated by dividing _________ hours into _______ hours times 100
A) Technician; clock B) Billable; clock C) Time; clock D) Clock; billable
B
You might also like to view...
_____ is composed of small beads or pellets and can be poured into blocks upon completion of the wall or in stages as the courses are built.
A. Poured-in-place insulation B. Foam-in-place insulation C. Expanded polystyrene D. A molded insert
Uphill flow of sewage is accomplished by a ____ pump.
A. leach B. rough C. septic D. grinder
Normal battery drain (parasitic drain) with a vehicle with many computer and electronic circuits is ________
A) 2 to 3 milliamperes B) 150 to 300 milliamperes C) 20 to 30 milliamperes D) None of the above
What instrument is used to take readings at specified intervals for later review?
A) Clamp-on ammeter B) Multimeter C) Data logger D) Voltmeter