Start windings are placed ____ the run windings.

A. outside
B. inside
C. between
D. in series with


Answer: C

Trades & Technology

You might also like to view...

When do the inspectors conduct inspection tests with their test equipment?

What will be an ideal response?

Trades & Technology

What is the color of a primer when it is dry after being applied on a nail?

What will be an ideal response?

Trades & Technology

What temperature sensors are used with a commercial air handler?

A) Preheat and postheat sensors B) Mixed air, supply air, and preheat sensors C) Preheat, low-temperature, and high-temperature sensors D) Mixed air and separated air sensors

Trades & Technology

If 10 is cubed the answer is 100.

Answer the following statement true (T) or false (F)

Trades & Technology