The project delivery method in which only one firm is contracted for both design and construction of the building is called the
A) CMAR method.
B) design-build method.
C) IPD method.
D) CMAA method.
E) design-bid-build method.
B) design-build method.
You might also like to view...
Application of phosphorus fertilizer usually makes plants more susceptible to diseases
Indicate whether the statement is true or false
____ are solid panels made of an insulating core bonded to a structural board on both the interior and exterior.
A. TRPs B. MNPs C. SIPs D. SBEs
A cooling tower in which air flow is produced by natural convection due to the density difference between the heated air in the tower and the cooler outside air is called
A) a mechanical draft tower B) An induced draft tower C) An atmospheric draft tower D) a draft-free tower
The minimum number of kitchen-area small appliance circuits required by the NECĀ® in a residence is _____
A) one B) two C) three D) four