The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can produce up to 24 rings each day using up to 60 total man-hours of labor. It takes 3 man-hours to make one VIP ring, versus 2 man-hours to make one SST ring.How many of each type of ring should be made daily in order to maximize the company's profit, if the profit on a VIP ring is $60 and the profit on an SST ring is $20?

A. 24 VIP and 4 SST
B. 20 VIP and 0 SST
C. 20 VIP and 4 SST
D. 24 VIP and 0 SST


Answer: B

Mathematics

You might also like to view...

Find the point(s) at which the given function equals its average value on the given interval.f(x) = ; [0, 24]

A.
B.
C.
D.

Mathematics

Evaluate the expression.-5-3

A. -125
B. 125
C.
D. - 

Mathematics

Use the formula for the general term (the nth term) of a geometric sequence to find the indicated term of the sequence with the given first term, a1, and common ratio, r.Find a11 when a1 = 70,000, r = 0.1.

A. 0.000007 B. 0.0000007 C. 70,001 D. 0.00000007

Mathematics

Perform the conversion. Round to the nearest hundredth when necessary.5 km to mi

A. 3.11 mi B. 8.05 mi C. 4.73 mi D. 5.3 mi

Mathematics