The relationship of the owner/engineer's resident project representative or inspector to the contractor should be which of the following:
A. A firm but amiable and cordial member of the construction team.
B. A technical policeman to insist upon rigid adherence to all orders and project documents provisions.
C. A firm adversary of the contractor to assure that there will be no attempt to "get by" with something.
D. Quite friendly; meet socially occasionally.
A
You might also like to view...
During change, _____ behavior is difficult to identify.
a. observable b. overt c. clandestine d. open
Care should be exercised when grinding and measuring the following on the Acme threading tool. Which is correct?
A) Side rake, back rake and relief angle B) End flat width, relief angle and thread angle C) Side rake, thread angle and relief angle D) Back rake, thread angle, and relief angles
The brake bleeding procedure usually specified for a rear-wheel vehicle with a dual split master cylinder is ________
A) RR, LR, RF, LF B) RF, LR, LF, RR C) LF, RF, LR, RR D) LR, RR, LF, RF
Convert 27' 6-1/8" to engineer's measure.
Fill in the blank(s) with the appropriate word(s).