A wind turbine service call is scheduled to take 100 man-hours. 34.7 man-hours of work have already been completed. How much work still needs to be done?
Fill in the blank(s) with the appropriate word(s).
65.3 m
Trades & Technology
You might also like to view...
What is the best way to tell if a disposable refrigerant cylinder is equipped with a dip tube?
a. Crack the valve to see what comes out b. Determine if it is an HFC or an HCFC c. Determine if it is azeotropic or near-azeotropic d. Check the cylinder labeling
Trades & Technology
This is the horizontal distance from end to end of the stairs:
A. rise B. run C. stairwell D. riser E. tread
Trades & Technology
In the circuit shown in Figure P11.7, a drain voltage of 0.1 V is established. Find the current iD for Vt = 1 V and k = 0.5 mA/V2.
Trades & Technology
Write Ohm’s Law as a formula using the symbol R for resistance, I for current, and V for volts.
What will be an ideal response?
Trades & Technology