As a typical example of a bar mark number assigned to a reinforcing bar shown on poured-in-place concrete drawings, 4A1 indicates ____.

A. a quantity of 4, bar type A, and length 1, where 1 is matched to the general legend for the drawings
B. a number 4 bar, type A, and quantity of 1 for this bar needed in the job
C. a number 4 bar, type A, and it is the first length of bar used in the job
D. the code for a particular bar type that is specified in the general legend for the drawings


Answer: C

Trades & Technology

You might also like to view...

The ____ test is used to ascertain the resistance to wear of hardened concrete samples.

A. freeze-thaw B. curring C. abrasion D. compressive strength

Trades & Technology

In addition to a simple gauge glass, boiler water level is also monitored by _____.

a. one other independent system b. two other independent systems c. cameras d. motor-operated valves

Trades & Technology

Calculate the harvesting capacity of a combine using the following formula:

HC = (S ×W× EFF ×Y) ÷ 8:25 Where: HC is the harvesting capacity, bu/hr. S is the combine speed, mph. W is the combine harvesting width, ft. EFF is the harvesting efficiency of the field. Y is the yield, bu/acre

Trades & Technology

___________ and electronic brake distribution are names for the electronic function of the proportioning valve by the ABS braking system.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology