Rank the following estimate types in terms of ac­curacy of the estimate from least accurate (1) to most accurate (5): partially designed, design 60% to 100% complete, order of magnitude, scoping/feasibility, detailed estimate.

What will be an ideal response?


(1) scoping/feasibility, (2) order of magnitude, (3) partially designed, (4) design 60-100% complete, (5) detailed estimate.

Trades & Technology

You might also like to view...

In what scenario would you use a bell and spigot pipe joint?

A. Plastic lines and pipes B. Copper water pipes C. Connecting two pipes of the same diameter D. Clay and concrete piping

Trades & Technology

In the wild, geese may live 15 years or more

a. True b. False Indicate whether the statement is true or false

Trades & Technology

Discuss precision sheet metal parts production.

What will be an ideal response?

Trades & Technology

Welding wire that has been graded for rigid control fabrication comes with a(n) _____

a. AWS guarantee for chemical safety b. Certificate of Conformance c. set of cast and helix instructions d. Certified Chemical Analysis report

Trades & Technology