What is usually the first step in a typical sequence of the project development process?

a. The project is built
b. The client formulates a series of needs or objectives to be accomplished by a particular time
c. The client accepts the design
d. A designer is contracted


B
The client formulates a series of needs or objectives to be accomplished by a particular time

Trades & Technology

You might also like to view...

____ porosity is most often caused by improper starting and stopping techniques.

A. Clustered B. Linear C. Piping D. Uniformly scattered

Trades & Technology

_____ Service researchers conduct studies on wildlife and fish and their habitats

A) Animal B) Range C) Government D) Forest

Trades & Technology

The owner of a vehicle equipped with cruise control complains that the cruise control often stops working when driving over a rough or bumpy road. Technician A says that the brake switch may be out of adjustment. Technician B says that a defective servo unit is the most likely cause. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

During the power stroke, when must the air/fuel charge be fully ignited in order for maximum combustion pressure and power production to occur?

What will be an ideal response?

Trades & Technology