Identify the ten major categories of supply chain risk
What will be an ideal response?
1. supplier failure to deliver; 2. supplier quality failures; 3 . outsoucing; 4. logistics delays or damage; 5. distribution; 6. information loss or distortion; 7. political; 8. economic; 9. natural catastrophes; 10. theft, vandalism, and terrorism
You might also like to view...
Which of the following statement(s) is/are correct?I. A predetermined overhead rate is used to assign estimated overhead costs to work in process inventory. II. The predetermined overhead rate is calculated by dividing estimated overhead cost by the estimated volume or level of activity. III. The most common means of allocating overhead costs is to calculate a predetermined overhead rate at the end of the period.
A. I and III B. I C. I and II D. II
A scale that has distance also has order but the reverse is not true
Indicate whether the statement is true or false
In a regression analysis, if SST = 4500 and SSR = 2925, then the correlation coefficient could be
A. .35 or -.35. B. .806 or -.806. C. 1. D. .65 or -.65.
One of the best places to look for early signals of change in a company's profitability is the
A) Form 10-K. B) Form 10-Q. C) Form 8-K. D) annual report sent to stockholders.