What is the first phase in the development of a construction project and what takes place during this phase?

What will be an ideal response?


The first phase in the development of a construction project is the feasibility phase. During this phase contracts are formed between an owner and a consultant, an engineering firm, or an architectural firm to perform a feasibility and site selection study.

Trades & Technology

You might also like to view...

Lighting contactors are rated for _____.

a. high horsepower loads b. low inrush currents and high voltages c. low inrush currents and low voltages c

Trades & Technology

Technician A says that fluid pressure is measured in kilopascals (kPa) or pounds per square inch. Technician B says that the area of a piston is used in calculating force. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician

Trades & Technology

The loads on a column are generally expressed in _______.

A) lb/ft2. B) lb/ft. C) lb. D) lb/ft3. E) none of the above.

Trades & Technology

In general, the __________ costly and __________ difficult it is for an organization to

enter an industry as a new competitor, the __________ are the barriers to entry to this industry.

a. more; less; lower b. more; more; lower c. more; more; higher d. less; less; higher e. more; less; lower

Trades & Technology