Overheating can cause a terminal to discolor or the wiring insulation to melt. What should you consider when repairing the wire or the terminal?

A) It is recommended to replace the entire wire with another wire of the same or larger gauge. If the terminal is on a relay, sequencer, or fuse block, the component should also be replaced in addition to the wire.
B) Replace the terminal end only. It is okay to cut off the end and repair the wire. If the terminal is on a relay, sequencer, or fuse block, the component should also be replaced in addition to the wire.
C) It is recommended to replace the entire wire with another wire of the same or larger gauge. If the terminal is on a relay, sequencer, or fuse block, only the wire needs to be replaced. The component does not need to be replaced.
D) Replace the terminal end only. It is okay to cut off the end and repair the wire. If the terminal is on a relay, sequencer, or fuse block, only the wire needs to be replaced. The component does not need to be replaced.


A

Trades & Technology

You might also like to view...

____ roofing is composed of polymer-modified bitumen reinforced with one or more plies of fabric, such as polyester glass fiber.

A. Modified asphalt roll B. Conventional hot built-up C. Cold-applied asphalt D. Fiberglass shingle

Trades & Technology

A vapor barrier is to be placed below the slab in Problem 56. Determine the number of 10-foot by 50-foot rolls of vapor barrier needed. The vapor barrier needs to be lapped one foot.

What will be an ideal response?

Trades & Technology

What is the material inside the filter-drier called?

A) Alcohol B) Hydrogen peroxide C) Wadding D) Desiccant

Trades & Technology

The highest element address number of an instruction in a bit file is __________.

A. 83 B. 84 C. 255 D. 256

Trades & Technology