When personnel are to be lifted by a crane, the wire rope, sling, shackles, and other rigging hardware must be capable of supporting at least _____ times the maximum intended load.

a. two
b. three
c. five
d. ten


c. five

Trades & Technology

You might also like to view...

Referring to the figure shown below, a blown fuse F5 would likely be caused by which of the following?

A. An open circuit between the fuse and the mirror heat switch B. A disconnected ground terminal for the mirror heating elements C. Too large of a MEGA® fuse supplying fuse F5 D. A short to ground somewhere in the wiring harness between the fuse and the loads

Trades & Technology

Explain the new design movement called universal design.

What will be an ideal response?

Trades & Technology

If the periodic voltage in Fig. 17.75(a) is applied to the circuit in Fig. 17.75(b), find i?(t).

Trades & Technology

Which of the following is the preferred method of attaching a fifth-wheel base plate to a truck frame?

A. weld 5th wheel base plate directly to the frame using AWS E-7018 electrodes or MIG equivalent B. bolt angle iron sections to the frame rails and weld 5th wheel base plate to the angle iron sections C. MIG weld base plate to rail flanges D. bolt base plate to the rail flanges

Trades & Technology