Use the information in Table J.16. What is the makespan through both machines if the SPT rule is used to determine the sequence at Machine 1 and the same sequence is also used at Machine 2?

A) fewer than or equal to 27 hours
B) greater than 27 hours but fewer than or equal to 28 hours
C) greater than 28 hours but fewer than or equal to 29 hours
D) greater than 29 hours


B

Business

You might also like to view...

All of the following characteristics are common to both tangible and intangible noncurrent assets with finite lives except

A) ?held for use and not for investment. B) expensed in the periods in which the assets are used in operations. C) ?have either a physical or financial nature. D) ?derive value from the ability to generate economic benefits.

Business

Culture includes all of the following EXCEPT ______.

A. religious systems B. educational systems C. political systems D. environmental systems

Business

Liquidity refers to the availability of resources to meet short-term cash requirements.

Answer the following statement true (T) or false (F)

Business

Pretrial conferences are:

A) Formal proceedings before the court. B) Permitted by federal and most state rules. C) To nail down all of the last minute items before going into trial. D) None of the above.

Business