The most commonly used leveling instrument for building layout, construction, and surveying due to ease of
use and rapid set-up time is the _____.
a. framing square
b. water level
c. builder?s level
d. auto level
d
You might also like to view...
The _____ is a special instrument or ruler that the architect uses to dimension drawings.
A. contractor's gauge B. scale rule C. architect's scale D. mason's rule
How are soil bacteria, fungi, and algae related to the type of cultivation and
vegetation in each sample area?
What will be an ideal response?The subsequent problems deal with the circuit below where all voltage sources are dc and the circuit is assumed to be in steady state. Also, R1 = R2 = R3 = R4 = R.If R3 is replaced by an closed (short) circuit and I2 is known, the current through R2 will be
A. I2 / 2 B. 0 C. ?I2 D. I2 E. 2I2
Why is information so critical to supply chain management?
What will be an ideal response?