A machinist can make 24 screws in one minute. How many screws can he make in 2 hour and 12 minutes and 45 seconds?
What will be an ideal response?
approximately 3,186 screws
You might also like to view...
Namethree practices used in construction that have an enormous potential to mitigate climate change, improve our quality of life, increase productivity through better occupancy conditions, and reduce operating costs.
What will be an ideal response?
What is the purpose of the crosshatch?
What will be an ideal response?
The steering gear is connected to the wheels by the ____.
A. steering linkage B. jam nut C. spool valve D. control valve
Which of the following determines the amount of force applied to a pull?
a. The number of wraps on the puller drum (capstan) b. The amount of wire-pulling lubricant being used c. The type of wiring-pulling rope being used d. The radius of the surface over which the cable is being bent