An order for 100 of a product is processed on work center 123. The setup time is 60 minutes and the run time is 5 minutes per piece. If the order is run on two machines in the work center, and the setups are made simultaneously, the elapsed time will be:

A) 250 minutes. B) 310 minutes. C) 500 minutes. D) 560 minutes.


B

Trades & Technology

You might also like to view...

The traditional method of improving food source quality and longevity has been:

a. gene splicing c. crossbreeding b. cloning d. none of these answers

Trades & Technology

What does the acronym IPM stand for?

What will be an ideal response?

Trades & Technology

One advantage of the glass-stem thermometer is that it:

A) Can cover a wide range with a precise resolution. B) Can easily display the difference between two separate temperatures. C) Is more rugged than electronic thermometers. D) Does not rely on any mechanical or electronic device that can malfunction.

Trades & Technology

The contacts of a current starting relay are:

A) Normally closed. B) Normally open. C) Modulating. D) Either normally open or normally closed depending upon the compressor.

Trades & Technology