What percentage fill is required by the NEC®?

You have a Rigid PVC conduit (RNC), schedule 80, that is required to hold the following conductors; six -18AWG TFN, ten -18AWG XFF and four -16AWG XF.


40%

Trades & Technology

You might also like to view...

Describe an alternative system for horizontal bracing.

What will be an ideal response?

Trades & Technology

A self-metering faucet

A. is spring-loaded to close immediately after the release of the handle B. closes a short time after the handle is released C. uses laser technology D. uses a cartridge and O-rings to control water flow

Trades & Technology

Engine oil pressure testing is being discussed. Technician A says that oil pressure should be tested with the engine cold. Technician B says low oil pressure can mean that major engine repairs are needed. Who is correct?

A. A only B. B only C. both A and B D. neither A nor B

Trades & Technology

Which laws were designed to strengthen farmers' legal rights to farm and prevent nuisance lawsuits against farmers?

A. subdivision B. Right to Farm C. Environmental Pollution D. Land Trust

Trades & Technology