The preliminary framing layout of a building is generally prepared by the
A) general contractor.
B) steel fabricator.
C) project's structural engineer.
D) project architect.
E) none of the above.
D) project architect.
You might also like to view...
How can you determine the wire size that can be used effectively with an insulated barrel crimp connector?
a. It is the same as the bolt or screw size permitted. b. It is indicated by the color-coding of the insulation on the connector. c. It is referenced by catalog number. d. It is the largest size of wire you can fit into the barrel
Slant lines that are used to show surfaces that have been cut through are called hidden lines.
Answer the following statement true (T) or false (F)
Why was the Italian Renaissance transitional?
a. It was partly open to women, but not entirely. b. It was partly the product of the Ottoman Empire. c. It was not quite modern, yet not entirely medieval either. d. It was partly Roman, partly Germanic.
A shorthand expression for showing an XOR operation between A and B is ________
Fill in the blank(s) with correct word