When concrete is being delivered to a construction site, an area must be set aside for _____.

a. truck parking
b. slump testing
c. refueling the trucks
d. weighing loads


Answer: B

Trades & Technology

You might also like to view...

Draw a pressure control loop.

What will be an ideal response?

Trades & Technology

Can plant tissue tests independently give the most complete picture of the nutrient status in the plant?

Indicate by YES (Y) or NO (N).

Trades & Technology

An advantage of a warm air electric furnace compared to an oil or gas furnace is

A) Lower operating cost in most parts of the country B) Warmer supply air temperatures C) No vent pipes, chimney, or makeup air are required D) Lower power requirements

Trades & Technology

General purpose branch circuits supply power to two or more outlets for __________ and __________ use.

What will be an ideal response?

Trades & Technology