List four underground utilities that must be located before trenching.________________________________________________________________________________________________________________________________________________
What will be an ideal response?
Electricity
Gas
Water
Cable TV
Fiber optic
Telephone
Sewer
You might also like to view...
In preventing cold stress, the use of radiant heaters and wind shields is considered what?
A) An ANSI requirement B) An acclimatizing method C) An engineering control D) None of the above
Genetically modified organisms (GMOs) must be appropriately labeled if used in petfoods
A. True B. False
The electrical power supplied to houses is usually:
A) 230 V, three-phase power. B) 440 V, single-phase power. C) 240 V, single-phase power. D) 208 V, three-phase power.
Pulse code modulation ________
A) has less accuracy the faster data is sampled B) is used for digital audio, Blu-Ray, CD, and DVD formats C) has few practical applications D) is used to convert digital values into analog signals