An uncovered cad cell tested with an ohmmeter produces a reading of 800?. The next step is to _____.
a. do nothing; the cell is working properly
b. check for pinched cad cell lead wires
c. clean the cell face
d. check the flame sighting
a. do nothing; the cell is working properly
You might also like to view...
Milk is drawn from the cow to a holding tank where it is rapidly cooled, then frozen
Indicate whether the statement is true or false
Two technicians are discussing vacuum brake boosters. Technician A says that a low, soft brake pedal is an indication of a defective booster. Technician B says that there should be at least two power-assisted brake applications after the engine stops running. Which technician is correct?
A) Technician A only B) Technician B only C) Both Technicians A and B D) Neither Technician A nor B
When testing a transistor set the DVOM to ________
A) Diode check B) Hertz C) AC volts D) DC volts
Convert the binary number 0001.0010 to decimal
A) 1.20 B) 1.80 C) 1.40 D) 1.125