An additional network segment is urgently needed for QA testing on the external network. A software release could be impacted id this change is not immediate. The request come directly from management, and there is no time to go through the emergency change control process. Given this scenario, which of the following is the BEST course of action for the network administrator to take?
A. Wait until the maintenance window, and make the requested change
B. First document the potential impacts and procedures related to the change
C. Send out a notification to the company about the change
D. Make the change, noting the requester, and document all network changes
Answer: D. Make the change, noting the requester, and document all network changes
You might also like to view...
Consider the class diagram of Exercise 2–9. Note that the Part, Chapter, and Section classes all include a title and a number attribute. Add an abstract class and a generalization relationship to factor out these two attributes into the abstract class.
When possible, you should try to customize your resume to fit the needs of the job you are applying for
Indicate whether the statement is true or false
Answer the following statement(s) true (T) or false (F)
Acquisitions of RAID drives can be challenging and frustrating for digital forensics examiners because of how RAID systems are designed, configured, and sized.
A threaded coaxial connector used to connect to a TV tuner is most often referred to as which of the following?
A. F-Connector B. RJ-11 Connector C. IEEE 1394 Connector D. RJ-45 Connector