Which security program document is usually established after all the other documentation has been created and implemented?
A. Guidelines
B. Procedure
C. Baselines
D. Standards
C
Explanation: Baselines are usually established after all the other documentation has been created and implemented. The baseline is a point in time that is used for comparison. Baselines cannot be established until a system or device is up and running, which implies that the guidelines, procedures, and standards for the system or device are already implemented.
You might also like to view...
The Mac OS X operating system is based on ________
A) Windows B) Linux C) UNIX D) DOS
Find the average, highest, and lowest age for students.
Write queries for the following. (Use tables created in Chapter 4 Lab Activity.)
AutoFit is applied to a column by double-clicking on the right border of the column in the ________
Fill in the blank(s) with the appropriate word(s).
Which of the following loops does not have an entry condition?
A. EOF-controlled while loop B. sentinel-controlled while loop C. do...while loop D. for loop