Technician A says that a pressure check valve should hold system pressure for at least five minutes after the pump is shut off. Technician B says that a defective check valve could cause long cranking time. Which technician is correct?

A) Technician A only B) Technician B only C) Both technicians D) Neither technician


C

Trades & Technology

You might also like to view...

A low voltage signal from the O2 sensor indicates:

A. A rich air/fuel mixture B. A lean air/fuel ratio C. A stoicheometric air/fuel ratio D. None of the above

Trades & Technology

In electronic variable orifice (EVO) steering systems:

What will be an ideal response?

Trades & Technology

In a 2-ton capillary tube system, the unit does not develop full capacity. Head pressure is low and suction pressure is high. What is the problem?

What will be an ideal response?

Trades & Technology

For recessing the nail for filling and finishing the wood surface, the nail used would be a ____.

A. finishing nail B. common nail C. roofing nail D. masonry nail

Trades & Technology