When automating your storyboard from the Projact panel to a sequence, what are the two ordering options, and how do they work?
What will be an ideal response?
Sort Order and Selection Order. If you choose Sort Order, the clips will be
placed into the sequence in a left-to-right and top-to-bottom order as you
arranged them in the Project panel. If you choose Selection Order, the clips will
be added to the sequence in the order you selected them (clicked them). You
can select multiple clips sequentially by holding down the Command key (Mac)
or the Control key (Windows) when clicking.
You might also like to view...
Which of the following is NOT true about action buttons?
A) With Action buttons, you can modify an existing shape or combine shapes together to make new shapes. B) Button actions include moving to a previous slide or the next slide, skipping to the first or last slide of the presentation, playing a sound or movie, opening a document, or opening a Help feature. C) Action buttons are available on the Insert tab in the Buttons gallery. D) You can change action button colors to better blend with your presentation.
Paragraphs who have their text aligned flush with both the left and right margin are said to be ________
A) centered. B) spaced. C) aligned right. D) justified.
Laws protecting the original works of authors such as texts, art, photographs, and music are known as:
What will be an ideal response?
Consider the following statements: struct rectangleData{ double length; double width; double area; double perimeter;}; rectangleData bigRect;Which of the following statements is valid in C++?
A. cin >> bigRect.length >> width; B. cout