The advantage of building data flow diagrams based on events is that:
A) events are small scale and easy to analyze for input and output.
B) users are familiar with the events within their business and know how the events drive other activities.
C) events fall into one of four categories: read, update, create, delete.
D) events are predictable and lend a high degree of stability to the data flow diagram.
B
You might also like to view...
Which of the following is the best example of an individual product?
A. 32-ounce boxes of Gain and Tide B. six brands of cookies C. three types of pears D. two brands of mountain bikes E. 12-oz. size of Pert Plus
The average manufacturing work week in metropolitan Chattanooga was 40.2 hours last year. It is believed that the recession has led to a reduction in the average work week. To test the validity of this belief, the hypotheses are
A. H0: ?< 40.2 Ha: ?? 40.2. B. H0: ?? 40.2 Ha: ?< 40.2. C. H0: ?> 40.2 Ha: ?? 40.2. D. H0: ?= 40.2 Ha: ?? 40.2.
A company that owns failing movie theaters could leverage existing assets by turning the buildings into performance spaces and conference sites.
Answer the following statement true (T) or false (F)
Pizazz, Inc sold a condo on the 34th floor in a building in downtown Chicago. The condo is considered a "good" and the contract will be governed by Article 2 of the UCC
Indicate whether the statement is true or false