The first step in assembling one or more intermediate lattice boom extensions on a telescoping-boom crane is to _____.

a. remove the swing-away from the main boom and place it on the ground
b. insert the attach points of the intermediate section into the main boom head
c. verify that the first intermediate section does not have a support roller
d. have the auxiliary crane support the main boom while installing the intermediate section


a. remove the swing-away from the main boom and place it on the ground

Trades & Technology

You might also like to view...

How many acres of organically produced crops are there in the U.S.?

What will be an ideal response?

Trades & Technology

Particulate matter (PM) is also called ________

A) Smog B) CO2 C) Soot D) HC

Trades & Technology

Professionalism includes which factor?

A) Becoming a teammate with your co workers B) Keeping your word C) Apologizing if you are wrong D) All of these

Trades & Technology

Which of the following solid state devices can be used to function in much the same way that a relay does?

A. diode B. transistor C. thermistor D. LED

Trades & Technology