For each part of the job, the concrete cover is determined by the _____

a. architect
b. local codes
c. structural engineer
d. concrete contractor


c

Trades & Technology

You might also like to view...

The ____ entrance is that section of the wiring system where electrical power enters a dwelling or building from the electric utility.

a. back b. service c. side d. front

Trades & Technology

Solve the proportion for the unknown term (x):  350/7 = 150/x.

What will be an ideal response?

Trades & Technology

When preparing a final grade, anticipate approximately _________ settling of the surface

a. 1 to 2% b. 5 to 10% c. 15 to 20% d. 70 to 80%

Trades & Technology

Which of these are helpful websites for service information on the Internet?

A) IATN B) NASTF C) Google D) All of these

Trades & Technology