A short circuit is what happens when _____.
a. the current bypasses the load
b. the wiring is not long enough
c. there is a shortage of current
d. the voltage is inadequate for the load
a. the current bypasses the load
You might also like to view...
This feature control is normally used for controlling arcs and curves.
A. circularity B. profile C. angularity D. cylindricity
Define the term “psychrometry.”
What will be an ideal response?
What is a daemon?
What will be an ideal response?
A large water utility is planning to upgrade its SCADA system for controlling well pumps, booster pumps, and disinfection equipment so that everything can be centrally controlled. Phase I will reduce labor and travel costs by $28,000 per year. Phase II will reduce costs by an additional $20,000 per year, that is, $48,000. Phase I savings should occur in years 0, 1, 2, and 3 and phase II savings should occur in years 4 through 10. Let i = 8% per year.
(a) Using a spreadsheet determine the present worth of the upgraded system for years 1 to 10. (b) The utility General Manager had hoped for a present worth of at least $400,000. Determine the interest rate at which this would be correct.