Cost, delivery date, and standards are all examples of:

A. specifications
B. constraints
C. performance criteria
D. attributes


Answer: B

Trades & Technology

You might also like to view...

Answer the following statement(s) true (T) or false (F)

Manual push button line voltage starters are manufactured with two or three line voltage contacts.

Trades & Technology

What is the goal of a QC program??

What will be an ideal response?

Trades & Technology

An existing two-lane rural highway is to be replaced by a four-lane divided highway on a new alignment. Construction of the new highway will commence two years from now and is expected to take three years to complete. The design life of the pavement is 20 years. The present ESAL is 150000. Design a flexible pavement consisting of an asphalt concrete surface and lime-treated base using the California (Hveem) method. The base has an R value of 80. The results of a stabilometer test on the subgrade soil are as follows.



What will be an ideal response?

Trades & Technology

The most common color code found in the network uses ________, ________, ________, ________

A) blue, orange, green, brown, aqua B) blue, orange, green, brown, slate C) red, black, white, orange, blue D) None of the above

Trades & Technology