Which of the following is needed to draw connection details?
A. All pertinent framing plans
B. A complete set of engineering drawings
C. Fabrication details for all structures
D. Shop drawings with final revisions included
Answer: A
You might also like to view...
Technician A says that post-2010 NG fueled commercial engines must be equipped with a DPF in the exhaust gas aftertreatment circuit. Technician B says that post-2010 NG fueled commercial engines are normally equipped with passive reduction and oxidation catalysts in the exhaust system. Who is correct??
A. ?Technician A only B. ?Technician B only C. ?Both A and B D. ?Neither A nor B
Agriculture in the United States ranks ____ in terms of end use of diesel fuel and fuel oil
a. third c. seventh b. fifth d. ninth
In Integrated Pest Management, a ____________________ of methods are used for maximum effectiveness
Fill in the blank(s) with correct word
Leaks in commercial refrigeration systems must be repaired if they have an annual leak rate of:
A) 10 percent of the charge per year. B) 15 percent of the charge per year. C) 25 percent of the charge per year. D) 35 percent of the charge per year.