What does a city typically require from the owner in consideration of the grant of a building permit?
What will be an ideal response?
The city needs:
(a) building permit application,
(b) required fee, and
(c) hard copies or a digital copy (or both) of the
construction document (CD) set, depending on the city.
You might also like to view...
Answer the following statement(s) true (T) or false (F)
1. The term inching is often used when referring to across-the-line starters. 2. Neither jogging nor inching prevent a holding circuit. 3. When a jogging circuit is used, the starter can be energized only as long as the jog button is depressed. 4. The addition of a control relay to a jogging circuit provides even greater control of the motor drive than the use of a jogging circuit alone. 5. A selector push button can be used to obtain jogging.
Describe the term, “concentration cycles” and how does it apply to CTW- 302.
What will be an ideal response?
Voltage is sometime referred to as emf. What does emf stand for?
a. Electromagnetic frequency b. Electromotive frequency c. Electromagnetic force d. Electromotive force
Electrical symbols in ladder and schematic diagrams:
A) Are standard throughout the industry. B) Represent electrical properties of common components. C) Look like the components they represent. D) Are unique to each component.