The key elements of the Kanban system as applied to software development are:
What will be an ideal response?
A. Visualize the workflow.
B. Keep work-in-process (WIP) as small as possible.
C. Reevaluate the workflow, reassigning priorities if need be.
D. Strive for continual improvement, eliminating bottlenecks and evaluating WIP limits.
You might also like to view...
Calling a member function of an object requires which item?
a. The dot operator. b. Open and close braces. c. The class name. d. None of the above.
The color, size, weight and speed of an object are examples of its _________.
a) attributes. b) behaviors. c) classes. d) requirements.
What is the difference between the iterators defined here.
```
vector
When the Pushpin icon on the Auto Hide button is vertical, the part of the Visual Studio window shown in the accompanying figure is said to be in ____________________ mode.
Fill in the blank(s) with the appropriate word(s).