Why are the structural steel columns the first part of the structural support frame to be detailed?
What will be an ideal response?
Columns are drawn first because they must show the top-of-steel elevations for the floor and roof beams and girders connecting to them as well as information about the sizes and types of connections required.
You might also like to view...
La letra N en la Figura 1 señala un/a _____.
a. cabezal
b. travesaño superior
c. repisón
d. travesaño superior doble
In an assured equipment grounding program on a job site containing temporary wiring, each receptacle and plug must be tested for the correct grounding conductor termination at intervals not exceeding _____.
a. two weeks b. month c. two months d. three months
What does an evaporator pressure regulator do?
A) Evaporator pressure regulator is simply another name for thermostatic expansion valve. B) It will not allow the evaporator pressure to drop below its setpoint, even if the suction pressure is lower. C) It is used in place of a more traditional refrigerant expansion device. D) It will not allow the evaporator pressure to rise above its setpoint, even if the suction pressure is higher.
With synchronous bus control, the CPU originates all timing and control signals
Indicate whether the statement is true or false