The two dimensions an electrician must know when making a 90° stub bend are the _____.
a. conduit diameter and rise
b. bend radius and conduit diameter
c. desired rise and take-up distance
d. take-up distance and conduit diam
c. desired rise and take-up distance
You might also like to view...
In the traditional system, subcontractors should not communicate directly with the architect but should approach the contractor's superintendent or ____________________.
Fill in the blank(s) with the appropriate word(s).
A terminal crossbreeding system will maximize heterosis in a herd of beef cattle
Indicate whether this statement is true or false.
The goal of a _____ program is to constantly improve the quality of welds by changing the procedures when needed to reduce the number of defects and to reduce construction costs.? ?
Fill in the blank(s) with the appropriate word(s).
In order for an animal to be considered a purebred, one of its parents must have been purebred of the same breed.
Answer the following statement true (T) or false (F)