Which type of lender often requires extra forms, drawings, and specifications that must be taken into account in the initial design stages?

A. credit union
B. corporate bank
C. private mortgage company
D. Federal Housing Administration (FHA)


Answer: D

Trades & Technology

You might also like to view...

In present-day construction, brick trimmer arches are seldom used because they require more time to install.

Answer the following statement true (T) or false (F)

Trades & Technology

There are design specifications for the minimum sight distance (distance to see an approach­ing vehicle measured along the roadway from the intersection of the two roadways) that a driver stopped at a stop sign must have to safely enter a roadway where vehicles do not stop. Values in the table below are for safe entry to cross the roadway (not to turn onto the other roadway but to cross) where vehicles do not stop.



(a) Plot a graph with design speed as the independent variable.
(b) Determine the equation of the relationship using the method of selected points.
(c) Determine the equation of the relationship using computer-assisted methods.
(d) Predict the slight distance required at 55 mph.

Trades & Technology

Any exposed live parts must be guarded if they are operating at _____.

a. 15V or more between terminals b. 50V or more between terminals c. 240V or more between terminals d. 600V or more between terminals

Trades & Technology

Which of the following procedures is used to examine the urethra and bladder?

A. Cystoscopy B. Arthroscopy C. Bronchoscopy D. Proctoscopy E. Esophagoscopy

Trades & Technology